SAINTE-MADELEINE-DE-LA-RIVIÈRE-MADELEINE

UNDERWATER REPAIR OF THE SAINTE-MADELEINE BRIDGE PILLAR

BLM was put in charge during this project by the client of the budget and schedule management, HR coordination, production of deliverables, etc.

 

Location

 

Sainte-Madeleine Bridge

Client

 

Ministère des Transports du Québec

 

Nature of the mandate

 

Repair of the concrete pillar by resurfacing without excess thickness. Prior bush hammering,installation of formwork, concrete pouring, formwork removal, final cleaning and restoration ofthe site.

Service rendered

 

  • Visual inspection of the structure with simultaneous video recording.
  • Installation of containment curtain.
  • Rehabilitation of the pillar by concreting without excess thickness.
  • Environmental Protection.

Challenges and solutions

 

The main problem was related to the protection of the environment in a protected salmon river. Our team used a containment curtain placed in a high flow river. The bush hammering work had to be done with care in order to limit the intake of sediment and concrete particles.